Case Study

Pipework Case Study

Pipework

PIPING OVERVIEW

Carbon steel, stainless steel, MDPE or HDPE, concrete or CLSP, small scale or large scale we can complete the lot.

Fabricated to requirements, or custom designed all work is complete to the highest standards (ASME 1X, API 1104, AS2980). Fusion welding of plastic materials can be completed in-house or on-site.

Pipework can be pre-spooled in one of our two workshops (carbon or stainless) or if required completed on site to ensure a perfect fit around and between existing installations.


STEEL

Guaranteed Flow Systems use fully experienced welders qualified to the highest standards (ASME IX, API 1104, AS 2980) in both carbon steel and stainless steel capabilities for all aspects of pipelines from the smallest diameter to 1200 mm or more.

PE

Guaranteed Flow Systems has personnel qualified and experienced to carry out electro fusion welding, for joining MDPE, HDPE and other plastic pipes. CPL with its certified operators provides safe, quality operations.

 

Latest Case Studies

Leak Repairs

Underground water transmission repairs





Waste Water

Hot Tapping

Guaranteed Flow Systems has developed an innovative procedure which allows for the installation of branch connections to live pressure mains.


Water

Modular Water Treatment Plant

The scope of this project was to supply and install a temporary membrane filtration unit to a bore water supply to remove manganese and iron. Designed to treat a flow of 5,200 m3 / day.

Water

 Subscribe to stay in the loop




 

Get in touch

map-marker

Address

8 Averton Place, East Tamaki, Auckland 2013, New Zealand PO Box 259194 Botany

mobile

Phone

+64 9 272 3496

mobile

Email

info@gfsystems.co.nz