Case Study

Pipework Case Study

Pipework

PIPING OVERVIEW

Carbon steel, stainless steel, MDPE or HDPE, concrete or CLSP, small scale or large scale we can complete the lot.

Fabricated to requirements, or custom designed all work is complete to the highest standards (ASME 1X, API 1104, AS2980). Fusion welding of plastic materials can be completed in-house or on-site.

Pipework can be pre-spooled in one of our two workshops (carbon or stainless) or if required completed on site to ensure a perfect fit around and between existing installations.


STEEL

Guaranteed Flow Systems use fully experienced welders qualified to the highest standards (ASME IX, API 1104, AS 2980) in both carbon steel and stainless steel capabilities for all aspects of pipelines from the smallest diameter to 1200 mm or more.

PE

Guaranteed Flow Systems has personnel qualified and experienced to carry out electro fusion welding, for joining MDPE, HDPE and other plastic pipes. CPL with its certified operators provides safe, quality operations.

 

Latest Case Studies

Large Plant

Guaranteed Flow Systems use fully experienced welders qualified to the highest standards (ASME IX, API 1104, AS 2980) in both carbon steel and stainless steel capabilities for all aspects of pipelines from the smallest diameter to 1200 mm or more

Process Pipework

Modular Waste Water Filtration Plant

Designed and built as temporary or permanent facilities to provide tertiary treatment of oxidation pond effluent.



Waste Water

Food & Beverage Industry

Supply and fabrication of equipment for the food and beverage industry




Food & Beverage Industry

 Subscribe to stay in the loop




 

Get in touch

map-marker

Address

8 Averton Place, East Tamaki, Auckland 2013, New Zealand PO Box 259194 Botany

mobile

Phone

+64 9 272 3496

mobile

Email

info@gfsystems.co.nz